Highway Maintenance Schemes Programme

The Highway Maintenance programme of works is developed from inspections, testing and scanner survey carried out each year and the information from this is used to determine the sites in need of attention, which is then added to a five year rolling programme that is reviewed annually.

A program of works based on the data received from the condition surveys was approved by Cabinet in March based on the programme.

As part of a gradual build up back to business as usual it is the intention to re-start this year’s schemes to prevent the condition of the Highway becoming worse, managing risk on the highway as traffic levels increase and reducing longer term costs of repairs.

Each site has been re-examined with regard to social distancing and appropriate safety measures and almost all are able to progress. An assessment is attached at Appendix 1 showing which schemes are proposed to continue and which may be deferred.

Financial/staffing/health & safety (inc virus transmission risks)/service delivery impacts/other risks and impacts considered:
Finance - Return to business as usual will improve efficiency and prevent more extensive costly repairs.
Insurance claims - Reduce the risk of insurance claims due to reduced maintenance
Public perception - More potholes appearing across the network leading to more complaints
COVID19 - The works can be progressed under the current guidelines with the necessary systems in place. Risk assessments and method statements are in place and being monitored.

All schemes have been reassessed regarding social distancing measures.

Equality Impacts:
Each scheme will consider equality needs as part of the temporary works during the delivery phase. The maintenance schemes should result in a reduction of potential hazards in the highway

Decision type: Non-key

Decision status: Recommendations Approved

Notice of proposed decision first published: 08/07/2020

Decision due: 28 May 2020 by Assistant Director Highways and Capital Projects

Lead member: Local Services Portfolio

Contact: Dave Winstanley, Group Director of Services Email: [email protected].