Minutes:
17/00636/OUTE - Outline planning permission for residential development of up to 985 dwellings (Use Class C3), convenience store with up to 400 sqm retail floor space (Use Class E), a GP (Class E) land for proposed primary school and early years school (Use Class F1) and sports pitches with associated parking, public open space, landscaping and sustainable drainage system (SUDS), onsite nutrient mitigation scheme and vehicular access points from Staindrop Road with all matters reserved except means of vehicular access For the avoidance of doubt planning permission is hereby sought separately and severably for site infrastructure landscaping and development cells identified on plan reference Indicative Development Framework plan (Drawing Number 7055-SK-01_R) (amended Flood Risk Assessment received 7 September 2017, Minerals Report, Agricultural Land Report and Phasing Plan received 26 September 2017, 2 October 2017, 9 October 2017, Archaeology Report received 23 November 2018; Transport Assessment Addendum and Arboricultural Report received 3 January 2019 and Environmental Statement received 11 January 2019; amended Planning Statement; updated Environmental Statement Addendum; Environmental Statement Non Technical Summary and Ecological reports received 28 January 2022; Shadow Habitat Regulations Assessment; Health Impact Assessment; Retail Sequential Test Assessment received 3 October 2022; amended Planning Statement Addendum, Biodiversity Net Gain Assessment received 2 November 2022; amended Indicative Development Framework Plan received 12 May 2023; amended Nutrient Neutrality Assessment and Mitigation Strategy Report and Shadow Habitats Regulations Assessment received 14 August 2023).
(In making its decision, the Committee took into consideration the Planning Officer’s report (previously circulated), the views of the Council’s Highways Engineer, Environmental Health Officer, Transport Policy Officer, Travel Plan Officer, Ecology Consultant, Head of Skills and Employability (Education), Conservation Officer and Public Rights of Way Officer, the views of the Durham County Council Archeology Team, the Environment Agency, Northumbrian Water, the Lead Local Flood Authority, National Highways, Natural England, Historic England, Northern Gasworks and Sport England.
Members were informed that prior to the adoption of the Darlington Local Plan (2016-2036) in February 2022, the planning application had attracted 72 letters of objection and three letters of representation. At this time objections were also received from Darlington Friends of the Earth, Darlington Bird Club, the Campaign for the Protection of Rural Countryside (CPRE), Jenny Chapman MP and Phil Wilson MP on behalf of constituents, and Low Coniscliffe and Merrybent Parish Council. A further 163 objections had been received following further notification exercises undertaken by the local planning authority, when appropriate, and the views of the Applicant’s Agent, and two objectors, whom the Committee heard.)
RESOLVED – Subject to the completion of an agreement under Section 106 of the Town and Country Planning Act 1990 within six months to secure planning obligations that are appropriate for the development covering:
a) £487,500 - A Public Transport contribution for Bus Service
b) £989,457 - Public Rights of Way Improvements and Safe Route to School including new bridge crossings
c) Travel Plan Contributions consisting of:
1) £2850 monitoring fee
2) Up to £295,500 for Personalised Travel Advice (based on £300 per household)
3) Up to £197,000 for Travel Plan Implementation Bond (based on £200 per household)
d) £573,111.69 Off site Highway Improvements Works on the A66/A67/ B6280 Morton Palms Roundabout north bound approach and A66/A1150 Burdon Roundabout
e) Up to £1,947,436.81 for off site highway improvements on the A68 corridor (based on £1,977.09 per dwelling)
f) £5000 for implementing a Traffic Regulation Order
g) Management Programme for open space and play areas.
h) Details of the retention and transfer of the land set aside for a primary school, playing fields, a local store and healthcare facility
i) 20% affordable housing, of which, 50% for affordable rent and 50% for affordable home ownership.
that Planning Permission be granted subject to the following conditions:
GENERAL
REASON - To accord with the provisions of Section 92(1) of the Town and Country Planning Act 1990.
REASON - To accord with the provisions of Section 92(1) of
the Town and Country Planning Act 1990.
REASON - To accord with the provisions of Section 92(1) of
the Town and Country Planning Act 1990.
APPROVED PLANS
a) Drawing Number 7055 –L- 100 - Location Plan
b) Drawing Number p16033-002A – Proposed Access Arrangement (only those works within the existing public highway and the application site)
REASON - For the avoidance of doubt.
REASON - For the avoidance of doubt.
HILLSIDE
CONDITION
REASON - For the avoidance of doubt.
MASTERPLAN
REASON - In order to achieve a satisfactory form of
development.
NUTRIENT
NEUTRALITY
Where part or all of the nutrient mitigation scheme relies upon the cessation of agricultural production within the red line boundary, then prior to the occupation of the first dwelling within that phase of the development evidence shall be proved in writing that such uses have ceased, a management plan setting out how the agricultural use remains ceased and an annual report demonstrating continued adherence to the nutrient mitigation scheme as approved.
REASON - To ensure the development is nutrient neutral in accordance with the Conservation of Habitats and Species Regulations 2017 (as updated, amended and superseded).
9.
Where part or all of the nutrient mitigation scheme
relies upon an appropriate Sustainable Drainage Systems (SuDs),
precise details of the SuDs measures and the reduction to the
nitrogen levels in accordance with guidance contained within Ciria
“Using SuDs to reduce Nitrogen In Surface Water Run
off” document (C815) dated 2023 shall be submitted and
approved in writing by the Local Planning Authority. The
development shall not be carried out otherwise than in complete
accordance with the agreed details, which shall be implemented in
full for that phase prior to the occupation of the first dwelling
within that phase of the development.
Where part or all of the nutrient
mitigation scheme (in a) above) includes reliance upon greenspace
and/or landscaped areas within the site red line boundary, then
prior to the commencement of that phase of the development a
landscape management plan, including the long term design
objectives, management responsibilities, and maintenance schedules
for such greenspace and/or landscaped areas (except privately owned
domestic gardens) shall be submitted to and approved in writing by
the Local Planning Authority. The landscape management plan shall
be carried out as approved and any subsequent amendments shall be
agreed in writing by the Local Planning Authority. The scheme shall
include the following elements:
a) The detail, extent and type of new planting.
b) Details of management regimes including confirmation that the green spaces and/or landscaped areas will be managed with no or low fertiliser input.
c) Details of any new habitat created on site including new drainage basins, habitat piles and great crested newt hibernacula.
d) Details of treatments of site boundaries and/or buffers around water bodies.
e) Details of dog waste bins [and signs to encourage their use]
f) Details of management responsibilities
g) Details of timetables for provision, management and maintenance of each element
REASON - To ensure the development is nutrient neutral in accordance with the Conservation of Habitats and Species Regulations 2017 (as updated, amended and superseded).
EXTERNAL MATERIALS
REASON - In the interests of the visual amenity.
PLAYING FIELDS/PITCHES
REASON - To ensure that the development makes appropriate sporting provision for its residents in accordance with para. 92 of the National Planning Policy Framework 2023.
REASON - To ensure that the development makes appropriate sporting provision for its residents in accordance with the National Planning Policy Framework 2023.
FLOOD RISK
AND DRAINAGE
a) Limiting the developable area, excluding roads and footpaths, outside of the 8 metre distance of the Main Rivers within the vicinity.
The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing/phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority.
REASON - To ensure future access to the Main Rivers for
maintenance purposes.
a) biosecurity and invasive non-native species (INNS) management best practice, utilising the check-clean-dry procedure across the site.
b) identify specific actions and mitigation for known INNS, and methods to ensure no INNS are brought on to site.
c) a procedure should be outlined in the event of new INNS being discovered whilst on site; in the event of which a strategy for containment and removal should be enacted.
REASON - To prevent the spread of invasive non-native species, such as Himalayan balsam, New Zealand pigmyweed, giant hogweed, Japanese knotweed, and signal crayfish.
a) detail extent and type of new planting (NB planting to be of native species)
b) details of maintenance regimes including how current hedgerows can be gap filled or laid to improve composition and value.
c) details of any new habitat created on site including new drainage basins, habitat piles or great crested newt hibernacula.
d) details of treatment of site boundaries and/or buffers around water bodies
e) details of management responsibilities
REASON - To ensure the protection of wildlife and supporting habitat and secure opportunities for the enhancement of the site’s nature conservation value of the site in line with national planning policy.
REASON - To ensure the protection of wildlife and supporting habitat. Also, to secure opportunities for enhancing the site’s nature conservation value in line with national planning policy. This approach is supported by paragraphs 174 and 180 of the National Planning Policy Framework 2023, which recognise that the planning system should conserve and enhance the environment by minimising impacts on biodiversity.
a) Confirmation of which sewage treatment works will receive the foul flows. Confirmation that there is sufficient capacity in the receiving Northumbrian Water network to accept the flows without increasing storm overflow spills.
b) Confirmation that there is sufficient capacity at the receiving sewage treatment works (STW) to accept the flows while still operating within the permitted flow and quality limits.
c) A timescale for the proposed works at Northumbrian Water Limited (NWL) sewage treatment works, which will provide the required extra capacity and treatment levels to prevent deterioration of the Water Framework Directive status of the Tees from Skerne to Tidal Limit waterbody (GB103025072595). This will ensure that any proposed works will align with the build times of the development.
d) If there is not currently capacity within the network or at the STW, then the plan should detail an appropriate phasing approach for the development to enable the necessary upgrades to the sewage network before connecting the development.
e) An assessment of the WFD impact to the Skerne to Tidal Limit waterbody (GB103025072595) from the increase of foul drainage looking at the impact of Ammonia and Phosphate concentrations of the waterbody.
f) An assessment of the hydraulic capacity, where any combined sewers will be connected into, demonstrating that no additional spills from combined systems will occur due to a lack of hydraulic capacity; and
g) An assessment of the total volume of foul drainage that will be generated by the development.
REASON - The Water Environment (Water Framework Directive) Regulations 2017 and the Northumbria River Basin Management Plan requires the restoration and enhancement of water bodies to prevent deterioration and promote recovery of water bodies. It specifically states that no waterbody should deteriorate in status and aim to achieve Good Status or Good Ecological Potential as soon as is reasonably practical. Any proposed plan or development should not contradict the Northumbria River Basin Management Plan 2015. Without this condition, the impact could cause deterioration of the Water Framework Directive status of the Tees from Skerne to Tidal Limit waterbody (GB103025072595). The Tees from Skerne to Tidal Limit (GB103025072595) has an overall status of Moderate.
a) Treatment and removal of suspended solids from surface water run-off during construction works.
b) Approach to ensure no sewage pollution or misconnections.
c) Approach to ensure water mains are not damaged during construction works.
d) Management of fuel and chemical spills during construction and operation, including the process in place to ensure the environment is not detrimentally impacted in the event of a spill.
e) If contaminated land is present, then construction runoff is likely to contain hazardous chemicals and elements. If this is the case, a scheme is required to manage the associated risks, and minimise mobilisation of hazardous pollutants into the water environment during construction and site operation.
REASON - To ensure that the development does not contribute to, and is not put at unacceptable risk from or adversely affected by, unacceptable levels of water pollution in line with paragraph 174 of the National Planning Policy Framework.
REASON - This approach is supported by paragraph 174 of the National Planning Policy Framework (2023) which recognises that planning should contribute to and enhance the environment by preventing new and existing development from contributing to, being put at unacceptable risk from, or being adversely affected by, unacceptable levels of soil, air, water or noise pollution or land instability. Development should, wherever possible, help to improve local environmental conditions such as air and water quality, considering relevant information such as river basin management plans.
a) Detailed design of the surface water management system including design water levels and finished floor levels demonstrating a suitable freeboard.
b) A build program and timetable for the provision of the critical surface water drainage infrastructure
c) A management plan detailing how surface water runoff from the site will be managed during construction Phase.
d) Details of adoption responsibilities; and
e) Management plan for the Surface Water Drainage scheme and any maintenance and funding arrangement.
The development or each phase of the development hereby approved shall not be brought into use until the approved ‘Surface Water Drainage’ scheme has been implemented and the approved scheme shall be maintained in accordance with the Surface Water Management scheme for the lifetime of the development.
REASON - To ensure the site is developed in a manner that
will not increase the risk of surface water flooding to site or
surrounding area, in accordance with the guidance within Policy DC2
of the Darlington Local Plan and the National Planning Policy
Framework 2023.
a) A surface water management strategy for the development will be required to manage and reduce the flood risk posed by runoff from the site, The developer will be required to ensure that any scheme for surface water should build in sufficient capacity for the entire site.
b) Surface Water discharge rates from the site must be restricted to existing Qbar rates for all storm events.
The mitigation measures shall be fully implemented prior to the occupation and subsequently in accordance with the timing/phasing arrangements embodied within the scheme, or within any period as may subsequently be agreed, in writing, by the local planning authority.
REASON - To prevent flooding by ensuring the satisfactory
storage of/disposal of surface water from the site and to reduce
the risk of flooding to the proposed development and future
occupants.
system for the development or any phase of the development is in place and fully operational. A maintenance plan detailing how the surface water management system will be maintained during the construction phase must also be submitted and approved in writing by the Local Planning Authority.
REASON - To reduce flood risk during
construction/development of the site.
REASON - To prevent the increased risk of flooding from any sources in accordance with the National Planning Policy Framework 2023.
PHASING
PLAN
REASON - To ensure that the key elements of each phase of the development is completed in an order which ensures that infrastructure needs, landscaping/open space and access are in place relevant to each phase before further development is undertaken, in the interests of good planning.
HIGHWAYS
REASON - To ensure that the A66 continues to serve its
purpose as part of a national system of routes for through traffic
in accordance with Section 10 (2) of the Highways Act 1980, in the
interests of road safety.
REASON - To ensure that the A66 continues to serve its
purpose as part of a national system of routes for through traffic
in accordance with Section 10 (2) of the Highways Act 1980, in the
interests of road safety.
REASON - In the interests of road safety.
REASON - To secure an appropriate highway constructed to an adoptable standard in the interests of highway safety and the amenity and convenience of all highway users.
REASON - To ensure safe and appropriate access and egress to the premises, in the interests of highway safety and the convenience of all prospective highway users.
REASON - To ensure safe and appropriate access and egress
and turning facilities to all premises, in the interests of highway
safety and the convenience of all prospective highway
users.
REASON - To ensure that the design is
appropriate in the interests of the safety and convenience of
highway users.
REASON - In the interests of highway safety.
REASON - To provide for adequate and satisfactory provision
of off-street accommodation for vehicles in the interest of safety
and the general amenity of the development.
SUSTAINABLE TRANSPORT
REASON - In order to promote sustainable modes of
transport.
REASON - To ensure that a bus service can be operational within the development.
REASON - To accord with Policy IN4 of the Local Plan.
TRAVEL
PLAN
REASON - To encourage and promote
sustainable transport.
HOUSING MIX
REASON – To ensure the development complies with
policy H4 of the Darlington Local Plan 2016 –
2036.
PUBLIC
RIGHTS OF WAY
REASON - To protect and enhance the existing Public Rights of Way in accordance with Policy IN1 of the Darlington Local Plan 2016 – 2036.
NOISE
(GENERAL/SCHOOL DEVELOPMENT/PLAYING FIELDS)
a) The noise impact assessment shall demonstrate via calculations that the following internal and external noise levels in respect of residential properties are not exceeded:
· Internal noise levels for bedrooms shall not exceed 30dB LAeq(8 hour)**
· Internal levels shall not exceed 45dB LAFmax more than 15 times during the night***
· Internal noise levels for living rooms shall not exceed 35dB LAeq(16 hour)**
· External noise levels within garden areas shall not exceed 55dB LAeq(16 hour)** unless otherwise agreed in writing with the Local Planning Authority
* A good acoustic design process should be followed in accordance with Professional Practice Guidance on Planning & Noise New Residential Development, May 2017.
** LAeq(8 hour) nighttime 8 hours between 23:00 and 07:00 and LAeq(16 hour) daytime 16 hours between 07:00 and 23:00. In relation to garden areas, where possible the desirable level of 50dB LAeq(16 hour) shall not be exceeded.
*** Justification shall be included in the noise impact assessment on the external LAFmax used to calculate the façade mitigation required and internal noise levels.
b) The detailed scheme of noise mitigation shall include the following:
· Details of the sound insulation, alternative forms of ventilation and any other works to be provided for the proposed residential properties to achieve the internal and external noise levels as specified above.
· The details (height, density), design and location of any acoustic barrier to be installed to achieve the internal and external noise levels at the proposed residential properties as specified above.
· A plan identifying the proposed residential properties which require noise mitigation, and the noise mitigation measures to be installed.
c) The requirements of this condition or parts of the condition can be dispensed with if it is demonstrated and agreed in writing with the Local Planning Authority that no adverse noise impacts from a particular source(s) will arise for the particular phase of the development.
The development of the phase(s) to which the noise impact assessment and scheme of noise mitigation relates shall not be carried out other than in complete accordance with the details so approved and thereafter shall be retained and maintained for the duration of the development. All works required by the scheme to achieve the internal and external noise levels at a residential property shall be completed prior to the occupation of that particular property.
REASON - In order to safeguard the amenities of the future
impacts of the development.
a) Protecting external areas of the school from excessive road traffic noise (having regard to Building Bulletin 93 (2003))
b) The impact of noise on the proposed residential development(s) from external plant, machinery and equipment associated with the school development. The rating level of noise emitted from external plant, machinery or equipment whether operating individually or when all plant is operating simultaneously, shall not exceed the daytime and night-time background sound level at any residential property when measured and assessed in accordance with BS4142 ‘Method for rating and assessing industrial and commercial sound’ unless otherwise agreed in writing by the Local Planning Authority. The background sound level to be used in the BS4142 Assessment and noise sensitive receptors shall be agreed in writing with the Local Planning Authority.
c) Minimising the impact of noise on the proposed residential development(s) from the use of music rooms, halls or equivalent noise generating facilities associated with the school development.
d) Minimising the impact of noise from playgrounds, playing fields and/or sports pitches (having regard to intended frequency and pattern of usage).
The approved details, findings and noise mitigation measures shall be implemented prior to the occupation of the school development/prior to the plant, machinery or equipment first becoming operational and thereafter shall be retained and maintained for the duration of the development.
REASON - In the interests of the amenities of the future occupants of the development.
a) Minimising the impact of noise on the proposed residential development(s) and shall include intended hours of use (to be agreed) and details (height, density), design and location of any acoustic barrier(s) to be installed, as well as details of any other mitigation.
The approved details, findings and noise mitigation measures shall be implemented prior to first use of any sports pitch(es) and thereafter shall be retained and maintained for the duration of the development.
REASON - In the interests of the amenities of the future
occupants of the development.
REASON - In the interests of the amenities of the future
occupants of the development.
EXTERNAL
LIGHTING
a) Times of operation of the proposed lighting units.
b) A description of the proposed lighting units including height, type, angling and power output for all lighting.
c) Drawing(s)/contour plans showing the luminance levels (both horizontal and vertical) of the lighting scheme to demonstrate that no excess light falls into the curtilage of sensitive neighbouring properties.
d) The Environmental Zone which the site falls within, in accordance with the Institution of Lighting Professionals Guidance on the Reduction of Obtrusive Light, to be agreed with the LPA. The relevant light sensitive receptors to be used in the assessment to be agreed with the LPA in advance of the assessment.
e) Details of the Sky Glow Upward Light Ratio, Light Intrusion (into windows of relevant properties) and Luminaire Intensity.
f) The limits for the relevant Environmental Zone relating to Sky Glow Upward Light Ratio, Light Trespass (into windows) and Luminaire Intensity, contained in Table 2 (Obtrusive Light Limitations for Exterior Lighting Installations) of the Institute of Lighting Professionals Guidance on the Reduction of Obtrusive Light shall not be exceeded.
REASON - In the interest of the visual appearance and amenity of the proposed development and to protect the amenities of the future occupiers of the development.
CONSTRUCTION IMPACTS
a) Dust Assessment Report which assesses the dust emission magnitude, the sensitivity of the area, risk of impacts and details of the dust control measures to be put in place during the construction phase of the development. The Dust Assessment Report shall take account of the guidance contained within the Institute of Air Quality Management “Guidance on the assessment of dust from demolition and construction” February 2014.
b) Methods for controlling noise and vibration during the construction phase and shall take account of the guidance contained within BS5228 “Code of Practice for noise and vibration control on construction and open sites” 2009.
c) Details of any temporary construction access to the site including measures for removal following completion of construction works.
d) Wheel and chassis underside washing facilities on site to ensure that mud and debris is not spread onto the adjacent public highway.
e) The parking of contractors’ site operatives and visitor’s vehicles.
f) Areas for storage of plant and materials used in constructing the development clear of the highway.
g) Measures to manage the delivery of materials and plant to the site including routing and timing of deliveries and loading and unloading areas.
h) Details of the routes to be used by HGV construction traffic and highway condition surveys on these routes.
i) Protection of carriageway and footway users at all times during demolition and construction.
j) Protection of contractors working adjacent to the highway.
k) Details of site working hours.
l) Erection and maintenance of hoardings including decorative displays, security fencing and scaffolding on/over the footway & carriageway and facilities for public viewing where appropriate.
m) Means of minimising dust emissions arising from construction activities on the site, including details of all dust suppression measures and the methods to monitor emissions of dust arising from the development.
n) Measures to control and monitor construction noise.
o) An undertaking that there must be no burning of materials on site at any time during construction.
p) Removal of materials from site including a scheme for recycling/disposing of waste resulting from demolition and construction works.
q) Details of the measures to be taken for the protection of trees.
r) Details of external lighting equipment.
s) Details of any ditches to be piped during the construction phases.
t) A detailed method statement and programme for the building works; and
u) Contact details for the responsible person (site manager/office) who can be contacted in the event of any issue.
The development shall
not be carried out otherwise than in complete accordance with the
approved Plan.
REASON - In the interests of highway safety and to protect the amenity of the local area
REASON - To protect the amenity of the local area.
REASON - To protect the amenity of the local
area.
NOISE
(COMMERCIAL UNIT)
REASON - In the interests of the general amenity of the
local area.
REASON - In the interests of general amenity of the local
area.
REASON - In the interests of general amenity of the local
area.
LAND
CONTAMINATION
REASON - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled. To ensure that risks from land contamination to the future uses of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out without unacceptable risks to receptors, in accordance with the National Planning Policy Framework 2023.
REASON - The site may be contaminated as a result of past or
current uses and/or is within 250 metres of a site which has been
landfilled. To ensure that risks from land contamination to the
future uses of the land and neighbouring land are minimised,
together with those to controlled waters, property and ecological
systems, and to ensure that the development can be carried out
without unacceptable risks to receptors, in accordance with the
National Planning Policy Framework 2023.
REASON - The site may be contaminated as a result of past or
current uses and/or is within 250 metres of a site which has been
landfilled. To ensure that risks from land contamination to the
future uses of the land and neighbouring land are minimised,
together with those to controlled waters, property and ecological
systems, and to ensure that the development can be carried out
without unacceptable risks to receptors, in accordance with the
National Planning Policy Framework 2023.
REASON - The site may be contaminated as a result of past or
current uses and/or is within 250 metres of a site which has been
landfilled. To ensure that risks from land contamination to the
future uses of the land and neighbouring land are minimised,
together with those to controlled waters, property and ecological
systems, and to ensure that the development can be carried out
without unacceptable risks to receptors, in accordance with the
National Planning Policy Framework.
REASON - The site may be contaminated as a result of past or
current uses and/or is within 250 metres of a site which has been
landfilled. To ensure that risks from land contamination to the
future uses of the land and neighbouring land are minimised,
together with those to controlled waters, property and ecological
systems, and to ensure that the development can be carried out
without unacceptable risks to receptors, in accordance with the
National Planning Policy Framework.
ECOLOGY
REASON - In the interest of protecting habitats and biodiversity.
REASON - To ensure that any impacts on biodiversity and ecology are mitigated and that appropriate enhancement works, and biodiversity net gain are secured.
REASON - To ensure that any impacts on biodiversity and ecology are mitigated and that appropriate enhancement works, and biodiversity net gain are secured.
· The Green Infrastructure corridor alongside the Baydale Beck should seek to significantly enhance the biodiversity value of this feature. Public access arrangements should reflect the importance of this feature as a wildlife corridor and the need to reduce disturbance of habitats along the Baydale Beck.
· The SUDs should incorporate retention basins/wetland habitat types as alternatives to detention basins. Retention features still have a drainage function but deliver far greater biodiversity gains. The use of conveyance features and rain gardens should be used throughout the development, integrated within Green Infrastructure and the development cells.
· The built environment should also provide opportunities for wildlife. Housing should provide nesting and roosting opportunities for bats, birds and invertebrates through the incorporation of built-in wildlife bricks that provide opportunities for a range of species. The range of species catered for should be expansive and approx. 30% of the houses should include some form of integrated nesting opportunities for wildlife.
· The use of flowering lawns rather than more intensively managed traditional amenity grasslands where considered appropriate.
· Green Infrastructure corridors should allow for a range of semi natural habitats, SUDs features and recreational opportunities to be included alongside access routes.
REASON - In the interest of protecting and enhancing habitats and biodiversity.
PLAY
AREAS
REASON - In the interests of the character and appearance of the proposed development.
BROADBAND
CONNECTIVITY
REASON - To ensure that the development is provided with
high quality broadband services enhancing its attractiveness, in
accordance with Policy IN8 of the Local Plan.
GREEN INFRASTRUCTURE/LANDSCAPING
REASON - In the interests of the character and appearance of the proposed development and in order to have regard to Appendix B Housing Allocation Statement (Site 249 – Coniscliffe Park North) contained within the Darlington Local Plan 2016 – 2036.
REASON - In the interests of the visual amenities of the
area.
EDUCATION
LAND
REASON - To ensure that land is allocated for such purposes
in the event of a school with associated playing fields being
required.
LOCAL
STORE
REASON - In the interests of retail planning policy.
GP
PRACTICE
SOILS
REASON - In order to safeguard soil resources as part of the overall sustainability objectives of the development.
TREES
a) The raising or lowering of levels in relation to the existing ground levels;
b) Cutting of roots, digging of trenches or removal of soil;
c) Erection of temporary buildings, roads or carrying out of any engineering operations;
d) Lighting of fires;
e) Driving of vehicles or storage of materials and equipment.
REASON - In the interests of the visual appearance of the site and surrounding area.
NOTE: Should the 106 Agreement not be completed within this prescribed period without the written consent of the Council to extend this time, the minded to approve status of the Permission shall be considered to be a refusal on the grounds that the Application has failed to provide adequate mitigation measures to provide a satisfactory form of development in accordance with the requirements of Darlington Local Plan 2016-2036, without further reference to the Planning Committee.