Minutes:
23/00782/FUL - Residential development consisting of 44 No. dwellings, with associated access, landscaping, SUDS pond and infrastructure, demolition of agricultural building and the regeneration of Blackwell Grange historic parkland (Amended CMP received 30th August 2023, Additional information regarding Vibration received 30th August 2023) (Amended plans / additional information received 28th September and 2nd October 2023).
(In making its decision, the Committee took into consideration the Planning Officer’s report (previously circulated), the views of the Council’s Highway Engineer, Transport Planning Officer, the Environmental Health Officer, the Historic Environment Record Officer, the Ecology Officer, the Senior Arboricultural Officer, and the Local Lead Flood Authority. The views of National Highways, the Council’s Conservation Advisor, Northumbrian Water and Historic England were also taken into consideration.
Members were informed that 120 letters from residents had been received in total, with some individual letters containing both points of support and objection. 109 letters were categorised as objections, with 11 categorised as letters of support, and the views of three objectors, two supporters and the Ward Councillor, where heard at the meeting by the Committee).
RESOLVED – Subject to the developer entering into an agreement pursuant to Section 111 of the Local Government Act 1972 to ensure that the developer enters into a Section 106 agreement within six months to secure the following:
a) £918,000 Affordable Housing Contribution;
b) £44,000 sustainable transport contribution;
c) £120,000 towards improvement scheme (A66 Bland’s Corner roundabout) to increase the capacity of the junction and maintain traffic flow along the strategic and local road networks.
d) A Landscape Management clause would be included within the Agreement.
that Planning Permission be granted subject to the following conditions:
GENERAL
APPROVED PLANS
BWG-SL-001 REV K Site Layout Plan
BWG-ED-001 Enclosures details
BWG-ENC-001 REV C Enclosures Layout
BWG-MCP-001 Overall POS MC Plan
BWG-POS-001 POS MC Plan Rev B
BWG-SG-001 Sales Garage Floor Plan
BWG-SG-001 Sales Garage Foundation Design
BWG-SS-001 Street scene
D334_L_100_REV I Landscape Strategy
D334D204 REV A Construction Details
BWG-MF-001 REV B Materials finishes layout.
D334_L_209_REV F Bat and Bird Box location Plan
BWG-BBP-001 REV B Bat and Bird Box location Plan
BWG-EV-001 EV Charging point locations
D334_L_201_REV P Parkland Landscape Strategy
D334_L_208_REV E Seat and Bin Locations
D334_P_205_REV D Parkland Tree Planting
D334_P_206_REV C Orchard Planting
D334_L_202_REV A Pond Layout
D334_P_207_ Pond Planting
BWG-BTP-001 Rev B Railing Plan
22100-01-T2 Engineering Layout sheet 1
22100-02-T6 Engineering Layout sheet 2
22100-03-T8 Engineering Layout sheet 3
22100-04-T2 Engineering Layout sheet 4
22100-05-T2 Engineering Layout sheet 5
22100-06-T4 Engineering Layout sheet 6
AU-M4(3)-01 Austin House Type Plans
AU-M4(3)-02 MAT TYPE 1 Austin Mat Type 1
AU-M4(3)-02 MAT TYPE 2 Austin May Type 2
AU-M4(3)-02 MAT TYPE 3 Austin Mat Type 3
AU-M4(3)-02 MAT TYPE 4 Austin Mat Type 4
AU-M4(3)-03 Roof Plan and section
HOUSE TYPE MOOD BOARD TYPE 1 REV J
HOUSE TYPE MOOD BOARD TYPE 2 REV J
HOUSE TYPE MOOD BOARD TYPE 3 REV J
HOUSE TYPE MOOD BOARD TYPE 4 REV H
BR-01 The Brunel Proposed floor plans.
BR-02 The Brunel Proposed elevations Mat Type 1
BR-02-MT02 The Brunel Proposed elevations Mat Type 2
BR-02-MT02 The Brunel Proposed elevations Mat Type 3
BR-02-MT02 The Brunel Proposed elevations Mat Type 4
BR-03 The Brunel Proposed roof plan section.
DA-01 The Darwin Proposed plan.
DA-02 The Darwin Second floor and roof plan
DA-03 The Darwin Mat Type 1
DA-03-MT02 The Darwin Mat Type 2
DA-03-MT03 The Darwin Mat Type 3
DA-03-MT04 The Darwin Mat Type 4
DA-04 The Darwin Proposed section.
DRL-GD-002 Double Garage Design
FR-01 The Franklin proposed plans.
FR-02 The Franklin proposed second floor and roof plan.
FR-03 The Franklin Mat Type 1
FR-03 The Franklin Mat Type 2
FR-03-MT03 The Franklin Mat Type 3
FR-03-MT04 The Franklin Mat Type 4
FR-04 The Franklin Proposed section.
MO-01 The Morris Proposed plans.
MO-02 The Morris Mat Type 1
MO-02 The Morris Mat Type 2
MO-02-MT02 The Morris Mat Type 3
MO-02-MT03 The Morris Mat Type 4
MO-03 The Morris Proposed roof plan section.
NI-01 The Nightingale Proposed floor plans.
NI-02 The Nightingale Mat Type 1
NI-02-MT02 The Nightingale Mat Type 2
NI-02-MT03 The Nightingale Mat Type 3
NI-02-MT04 The Nightingale Mat Type 4
NI-03 The Nightingale Proposed Roof Plan section.
P-DE-001 Herringbone Drive Detail
WO-01 The Wordsworth Proposed Floor Plans.
WO-02 The Wordsworth Mat Type 1
WO-02-MT02 The Wordsworth Mat Type 2
WO-02-MT02 The Wordsworth Mat Type 3
WO-02-MT03 The Wordsworth Mat Type 4
WO-03 Wordsworth Proposed roof plan section.
22100 101 P5 SUDS Maintenance Plan
22100 501 REV P2 Pumping Station
22100 95 T5 SUDS Sections
HILLSIDE CONDITION
REASON - For the avoidance of doubt
M4 STANDARD
REASON – To ensure the development complies with policy H4 of the Darlington Local Plan 2016 – 2036.
HIGHWAY
The completion of all road works, including any phasing, must be in accordance with a programme submitted to and approved in writing with the Local Planning Authority before any part of the development is brought into use.
REASON - To ensure safe and appropriate access and egress to the premises, in the interests of highway safety and the convenience of all prospective highway users.
REASON – In the interests of highway safety.
The proposed ‘Ghost Island’ Junction access to be located on Carmel Rd South in accordance with DMRB CD123 along with details of footways and pedestrian crossing facilities which link to the surrounding cycling/pedestrian infrastructure. Works include but are not limited to, resurfacing works, kerbing and drainage signage and lining. Prior to occupation of the first dwelling.
For each scheme of off-site highway mitigation, except for investigative works, no excavation or other groundworks or the depositing of material on site in connection with the construction of any scheme of off-site highway mitigation or any structure or apparatus which will lie beneath that scheme must take place, until full detailed engineering drawings of all aspects of that scheme including any structures which affect or form part of the scheme have been submitted to and approved in writing by the Local Planning Authority.
An independent Stage 2 Road Safety Audit carried out in accordance with GG119 - Road Safety Audits or any superseding regulations must be included in the submission and the design proposals must be amended in accordance with the recommendations of the submitted Safety Audit within three months of the granting of planning permission or within such extended time as may be agreed in writing by the Local Planning Authority.
A programme for the delivery of that scheme and its interaction with delivery of the other identified schemes must be submitted to and approved in writing by the Local Planning Authority within three months of the granting of planning permission or within such extended time as may be agreed in writing by the Local Planning Authority.
Each item of the off-site highway works must be completed in accordance with the approved engineering details and programme.
REASON - To ensure that the design is appropriate in the interests of the safety and convenience of highway users.
REASON - To provide for adequate and satisfactory provision of off-street accommodation for vehicles in the interest of safety and the general amenity of the development.
CONSTRUCTION IMPACTS
Dust Mitigation/Assessment Report, Homes by Esh
Construction Management Plan Drawing Number BWG-CMP-001 Revision G dated 07.11.2023, Homes by Esh
Noise at Work (Reference ECP024, Issue: 1, Revision O), Homes by Esh
Wheel Washing Safety Method Statement, Homes by Esh dated 02.11.2023.
REASON – In the interests of highway safety and residential amenity.
10.
Notwithstanding the details set out in condition 9
in relation to the construction management plan, contact details
for the responsible person (site manager/office) who can be
contacted in the event of any issue shall be submitted to the Local
Planning Authority prior to the first occupation of any of the
dwellings. This information shall also
be provided with the sales contract information for all
properties.
REASON – To protect the amenities of residents of the new development.
REASON – In the interests of residential amenity.
REASON – In the interests of amenity.
TRANSPORT POLICY
REASON – To provide a safe route to school in the interests of pedestrian safety.
REASON – To encourage the use of sustainable modes of transport to and from the development.
REASON - To accord with Policy IN4 of the Local Plan
FLOODING AND DRAINAGE
REASON - To prevent the increased risk of flooding from any sources in accordance with the NPPF.
Discharge of Surface Water · Repairs and cleansing to Highways Drainage to an adoptable standard as agreed with ESH. Communicated via email on the 30th of October 2023.
The mitigation measures shall be fully implemented prior to the occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any period as may subsequently be agreed, in writing, by the local planning authority.
REASON - To prevent flooding by ensuring the satisfactory storage of / disposal of surface water from the site and to reduce the risk of flooding to the proposed development and future occupants.
REASON - To reduce flood risk and ensure satisfactory long-term maintenance are in place for the lifetime of the development.
LAND CONTAMINATION
REASON - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled. To ensure that risks from land contamination to the future uses of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out without unacceptable risks to receptors, in accordance with the National Planning Policy Framework.
A Phase 4 Verification and Completion Report shall be compiled and reported by a "suitably competent person(s)", documenting the purpose, objectives, investigation and risk assessment findings, remediation methodologies, validation results and post remediation monitoring carried out to demonstrate the completeness and effectiveness of all agreed remediation works conducted. The Phase 4 Verification and Completion Report and shall be submitted and agreed in writing with the Local Planning Authority within 2-months of completion of the development or at a time agreed unless the Local Planning Authority dispenses with the requirement specifically and in writing.
The properties which require remediation works, shall not be occupied until all the approved investigation, risk assessment, remediation and verification requirements relevant to the site (or part thereof) have been completed, reported and approved in writing by the Local Planning Authority.
REASON - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled. To ensure that risks from land contamination to the future uses of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out without unacceptable risks to receptors, in accordance with the National Planning Policy Framework.
NOISE
REASON – In the interests of residential amenity.
LANDSCAPE AND MEANS OF ENCLOSURE
REASON – In the interests of visual and residential amenity.
REASON – To ensure a satisfactory appearance of the site and to improve the visual amenities of the area.
TREES
The agreed scheme of protection shall be in place before the commencement of any work, including demolition operations. Notwithstanding the approved specification, none of the following activities shall take place within the segregated protection zones in the areas of the trees.
a) The raising or lowering of levels in relation to existing ground levels.
b) Cutting of roots, digging of trenches or removal of soil.
c) Erection of temporary buildings, roads, or carrying out of any engineering operations.
d) Lighting of fires.
e) Driving of vehicles or storage of materials and equipment.
REASON – To ensure a maximum level of protection to safeguard the wellbeing of the trees on the site and in the interests of the visual amenities of the area.
HERITAGE IMPACTS
REASON - To ensure that an appropriate record is made of the historic building fabric that may be affected by the development.
REASON – To both ensure retention of historic fabric and ensure that the adjacent areas of landscaping are retained or reinforced/replanted following removal to facilitate the works to conserve that combined character.
REASON - To recognise the heritage significance of the site.
ECOLOGY
REASON – In the interests of biodiversity.
REASON – In the interests of biodiversity.
REASON – In the interests of biodiversity.
REASON – In the interests of ecology and to ensure that 10% biodiversity net gain is achieved throughout the overall development in accordance with the requirements of the NPPF and Policy ENV8.
HOUSING DEVELOPMENT
33. The housing element of this planning permission relates only to allocation 403 (Blackwell Grange East) as identified in the Darlington Local Plan (2016 – 2036).
REASON – For the avoidance of doubt.
NUTRIENT NEUTRALITY
REASON - To ensure the development is nutrient neutral in accordance with the Conservation of Habitats and Species Regulations 2017.
NOTE: Should the 106 Agreement not be completed within this prescribed period without the written consent of the Council to extend this time, the minded to approve status of the Permission shall be considered to be a refusal on the grounds that the Application has failed to provide adequate mitigation measures to provide a satisfactory form of development in accordance with the requirements of Darlington Local Plan 2016-2036, without further reference to the Planning Committee.
NOTE: The Chair used his powers to vary the order of the Agenda, and took this item ahead of the above Minute PA56 (a) and Minute PA56 (b) at the meeting.