Minutes:
NOTE – APPLICATIONS FOR PLANNING PERMISSION – The following standard conditions are referred to in those Minutes granting permission or consent :-
Code No. |
Conditions |
A3 |
Implementation Limit (Three Years) The development hereby permitted shall be commenced not later than the expiration of three years from the date of this permission. Reason - To accord with the provisions of Section 91(1) of the Town and Country Planning Act, 1990. |
B4 |
Notwithstanding any description of the external materials in the submitted application, details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved by, the Local Planning Authority in writing prior to the commencement of the development and the development shall not be carried out otherwise than in accordance with any such approved details. Reason - In order that the Local Planning Authority may be satisfied as to the details of the development in the interests of the visual amenity of the area. |
E2 |
A landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority prior to any works commencing and, upon approval of such schemes, it shall be fully implemented concurrently with the carrying out of the development, or within such extended period as may be agreed in writing by, the Local Planning Authority, and thereafter any trees or shrubs removed, dying, severely damaged or becoming seriously diseased shall be replaced, and the landscaping scheme maintained for a period of five years to the satisfaction of the Local Planning Authority. Reason - To ensure a satisfactory appearance of the site and in the interests of the visual amenities of the area. |
E3 |
The submitted landscaping scheme shall be fully implemented concurrently with the carrying out of the development, or within such extended period which may be agreed in writing by, the Local Planning Authority and thereafter any trees or shrubs removed, dying, severely damaged or becoming seriously diseased shall be replaced, and the landscaping scheme maintained for a period of five years to the satisfaction of the Local Planning Authority. Reason - In the interests of the visual amenities of the area. |
CL2 |
Prior to the commencement of the development and any site investigation works or at a time agreed in writing by the Local Planning Authority a Phase 2 Site Investigation Strategy (Sampling and Analysis Plan) shall be designed and documented by a "suitably competent person(s)" in accordance with published technical guidance (e.g. BS10175 and CLR11) and be submitted to and agreed in writing with the Local Planning Authority, unless the Local Planning Authority dispenses with the requirement specifically and in writing. The Phase 2 Site Investigation Strategy (Sampling and Analysis Plan) shall be sufficient to fully and effectively characterise and evaluate the nature and extent of any potential contamination sources, hazards and impacts. No alterations to the agreed Phase 2 Site Investigation Strategy or associated works shall be carried out without the prior written agreement of the Local Planning Authority. Reason - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection. |
CL3 |
Prior to the commencement of the development or at a time agreed in writing by the Local Planning Authority a Phase 2 Site Investigation works shall be conducted, supervised and documented by a “suitably competent person(s)” and carried out in accordance with the approved Phase 2 Site Investigation Strategy (Sampling and Analysis Plan). A Phase 2 Site Investigation and Risk Assessment Report prepared by a “suitably competent person(s)”, in accordance with published technical guidance (e.g. BS10175 and CLR11) and shall be submitted to and agreed in writing with the Local Planning Authority unless the Local Planning Authority dispenses with the requirement specifically and in writing. Reason - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection |
CL4 |
Prior to the commencement of the development or at a time agreed in writing by the Local Planning Authority a Phase 3 Remediation and Verification Strategy shall be prepared by a "suitably competent person(s)" to address all human health and environmental risks associated with contamination identified in the Phase 2 Site Investigation and Risk Assessment. The Remediation and Verification Strategy which shall include an options appraisal and ensure that the site is suitable for its new use, and shall be submitted to and agreed in writing with the Local Planning Authority, unless the Local Planning Authority dispenses with the requirement specifically and in writing. No alterations to the Remediation and Verification Strategy or associated works shall be carried out without the prior written agreement of the Local Planning Authority. The Phase 3 Remediation and Verification works shall be conducted, supervised and documented by a "suitably competent person(s)" and in accordance with the approved Phase 3 Remediation and Verification Strategy. Reason - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection |
CL5 |
Any contamination not considered in the Phase 3 Remediation and Verification Strategy, but identified during subsequent construction/remediation works shall be subject to further risk assessment and remediation proposals agreed in writing with the Local Planning Authority and the development completed in accordance with any further agreed amended specification of works. Reason - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection |
CL6 |
A Phase 4 Verification and Completion Report shall be complied and reported by a "suitably competent person(s)", documenting the purpose, objectives, investigation and risk assessment findings, remediation methodologies and validation results obtained to demonstrate the completeness and effectiveness of all approved remediation works conducted. The Phase 4 Verification and Completion Report and shall be submitted and agreed in writing with the Local Planning Authority within 2-months of completion of the development unless the Local Planning Authority dispenses with the requirement specifically and in writing. The development site or agreed phase of development site, shall not be occupied until all of the approved investigation, risk assessment, remediation and verification requirements relevant to the site (or part thereof) have been completed, reported and approved in writing by the Local Planning Authority. Reason - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection |
PL |
The development hereby permitted shall be carried out in accordance with the approved plan(s) as detailed below, ^IN; Reason - To define the consent. |
(1) Planning Permission Granted
17/01195/OUT - Field at OSGR E435307 N513463 Yarm Road Middleton St George Darlington. Outline planning application for the erection of up to 330 residential dwellings with associated landscaping and engineering works, 3 retail units and provision of a new single form Primary School.
(In reaching its decision, the Committee took into consideration the Planning Officer’s report (previously circulated) and the views of the applicant’s agent and the objections of Middleton St George Parish Council, both of whom Members heard). It was reported that the previous holding objection of Highway’s England had now been withdrawn.
RESOLVED – (a) That the Director of Economic Growth be authorised to negotiate an agreement under Section 106 of the Town and Country Planning Act 1990 within six months to secure planning obligations that are appropriate for the development covering:
i) strategic network improvements;
ii) gifting of school site to the council for provision of a single form primary school in lieu of a financial education contribution;
iii) sustainable transport contribution - payment of contribution to be made no later than on the occupation of the 50th dwelling; and
iv) provision of one bus pass per dwelling for a minimum of two years.
(b) That upon satisfactory completion and signing of that agreement, planning permission be granted subject to the following conditions and reasons:
1. Approval of the following details (‘the reserved matters) in respect of the development shall be obtained from the Local Planning Authority in writing before the development is commenced:
a) layout
b) scale
c) appearance
d) landscaping
The development shall not be carried other than in
accordance with the approved plans. Application(s) for the reserved
matters for any building/s or phase of development shall be made to
the local planning authority before the expiration of eighteen
months from the date of this permission.
Reason – To accord with the provisions of
Section 92(1) of the Town and Country Planning Act 1990 and to
ensure the speedy provision of this site for the approved
development.
2. The development hereby permitted shall be begun either before the expiration of;
(a) three years from the date of this permission, or
(b) one year from the date of approval of the last of the reserved matters to be approved; whichever is the later.
3.
PL (Accordance with plans)
Y81:1054.06 Revision D Developable areas
Y81.1054.05 Revision D Illustrative masterplan
4. E3 Landscaping (Implementation).
5. The development shall not begin until a scheme for the provision of affordable housing as part of the development has been submitted to and approved in writing by the local planning authority. The affordable housing shall be provided in accordance with the approved scheme and shall meet the definition of affordable housing in Annex 2 of the National Planning Policy Framework or any future guidance that replaces it. The scheme shall include:
(a) the numbers, type, tenure and location on the site of the affordable housing provision to be made, which shall consist of not less than 20% of housing units;
(b) The timing of the construction of the affordable housing and its phasing in relation to the occupancy of the market housing;
(c) The arrangements for the transfer of the affordable housing to an affordable housing provider [or the management of the affordable housing] (if no RSL involved);
(d) The arrangements to ensure that such provision is affordable for both first and subsequent occupiers of the affordable housing; and
(e) The occupancy criteria to be used for determining the identity of occupiers of the affordable housing and the means by which such occupancy criteria shall be enforced.
Reason – To comply with Council Housing Policy
6. The development hereby approved shall not be commenced on site, until a scheme of ‘Surface Water Drainage and Management’ for the implementation, maintenance and management of the sustainable drainage scheme has first been submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented and thereafter managed and maintained in accordance with the approved details. The scheme shall include, but not be restricted to providing the following details:
i. Detailed design of the surface water management system including design water levels and finished floor levels demonstrating a suitable freeboard;
ii. A build program and timetable for the provision of the critical surface water drainage infrastructure;
iii. A management plan detailing how surface water runoff from the site will be managed during the construction phase;
iv. Details of adoption responsibilities;
v. Management plan for the Surface Water Drainage Scheme.
The building hereby approved shall not be brought into use until the approved ‘Surface Water Drainage’ scheme has been implemented and the approved scheme shall be maintained in accordance with the Surface Water Management scheme for the lifetime of the development.
Reason – To ensure the site is developed in a manner that will not increase the risk of surface water flooding to site or surrounding area, in accordance with the guidance within Core Strategy Development Plan Policy CS10 and the National Planning Policy Framework.
7. The development permitted by this planning permission shall only be carried out in accordance with the approved Flood Risk Assessment (FRA) and Drainage Strategy dated 11th December 2017 and the following mitigation measures detailed in the FRA.
· Limiting the surface water run-off generated by the impermeable areas of the development up to and including the 100 year critical storm so that it will not exceed the run-off from the undeveloped site and not increase the risk of flooding off-site. This will be achieved in accordance with section 10.6 and 10.7 stating a post development discharge limit of 224.3l/s (subject to condition below.
· Further, the applicant shall demonstrate that the existing positive drainage network is currently operable. Otherwise, the existing impermeable area shall be considered as greenfield for the pre?development run-off calculations.
The
mitigation measures shall be fully implemented prior to the
occupation and subsequently in accordance with the timing/phasing
arrangements embodied within the scheme, or within any period as
may subsequently be agreed, in writing, by the Local Planning
Authority.
Reason – To prevent flooding by ensuring the
satisfactory storage of/disposal of surface water from the site and
to reduce the risk of flooding to the proposed development and
future occupants.
8.
No dwellings should be occupied until the surface
water management system for the development or any phase of the
development is in place and fully operational. A maintenance plan detailing how the surface water
management system will be maintained during the construction phase
must also be submitted and approved in writing by the Local
Planning Authority.
Reason – To reduce flood risk and ensure
satisfactory long term maintenance for the lifetime of the
development.
9.
Development shall not commence until a detailed
scheme for the disposal of foul and surface water from the
development hereby approved, has been submitted to and approved in
writing by, the Local Planning Authority. Thereafter, the development shall not take place
otherwise than in complete accordance with the approved
details.
Reason – To prevent the increased risk of
flooding from any sources in accordance with the NPPF.
10. Prior to the commencement of the development, a Demolition and Construction Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The plans shall include the following:
(a) Methods for controlling dust from the construction activities on site. These have already been outlined in the Miller Goodall Air Quality Assessment submitted with the application and should be incorporated into the CMP as part of the measures necessary to control dust on the site;
(b) Dust Assessment Report which assesses the dust emission magnitude, the sensitivity of the area, risk of impacts and details of the dust control measures to be put in place during the demolition and construction phases of the development. The Dust Assessment Report shall take account of the guidance contained within the Institute of Air Quality Management ‘Guidance on the assessment of dust from demolition and contrucution’ February 2014;
(c) Methods for controlling noise and vibration during the demolition and construction phase7. which shall take account of the guidance contained within BS5228 ‘Code of Practice for noise and vibration control on construction and open sites’ 2009;
(d) Construction Traffic Routes, including parking areas for staff and visitors;
(e) Details of wheel washing;
(f) Road Maintenance;
(g) Warning signage;
(h) Details of parking for show homes.
Reason – In the interests of highway safety and residential amenity.
11. CL2 Phase 2 Site investigation Strategy
12. CL3 Phase 2 Investigation Works
13. CL4 Phase 3 Remeviation and Verification Strategy
14. CL5 Construction/Remediation Works
15. CL6 Phase 4 Verification and Completion Report
16.
For each phase of development, prior to, or at the
same time as any reserved matters application, relating to layout,
scale, appearance and landscaping, a noise impact assessment and a
scheme to protect any noise sensitive receptors from excessive
noise, undertaken by a suitably qualified acoustic consultant shall
be submitted to and approved in writing by, the Local Planning
Authority. The scope of the report,
including the relevant noise sources to be considered and noise
sensitive receptors shall be agreed in advance with the Local
Planning Authority. Any works which
form part of a mitigation scheme outlined in the noise impact
assessment shall be completed prior to any party of the development
being first occupied or used, or within an alternative timescale to
be agreed with the Local Planning Authority. This requirement can be dispensed with if it is
demonstrated and agreed in writing with the Local Planning
Authority that no adverse noise impacts will arise for each
phase.
Reason – In the interests of residential
amenity.
17.
Construction and demolition work shall not take
place outside the hours of 08:00-18:00 Monday to Friday,
08:00-13:00 Saturday with no working on a Sunday and Bank/Public
Holidays without the prior written permission from the Local
Planning Authority.
Reason – In the interests of residential
amenity.
18.
No development shall be carried out unless and until
vehicle swept path analysis has been undertaken to support the
movement framework for emergency vehicles, refuse vehicles and
buses, for the internal network and, where appropriate, in respect
of the off-site highway proposals, details of which shall be
submitted to, and approved by the Local Planning Authority.
Reason – In the interests of highway
safety.
19.
Prior to the commencement of the development,
precise details of car parking and secure cycle parking and storage
details shall be submitted and approved in writing by the Local
Planning Authority. The details shall
include the number, location and design of the cycle stands and the
development shall not be carried out otherwise than in complete
accordance with the approved details.
Reason- In the interests of highway
safety.
20.
Precise details of the off-site highway works
required to access the site and mitigate the development impact
shall be submitted to and approved by the Local Planning Authority
prior to the commencement of the development. The submitted details shall include dropped kerbs,
footways to the development frontage to connect into the
surrounding infrastructure, tactile paving, improvements to visibility splays, junctions,
roundabout, bus stops traffic calming and signage/road markings.
The development shall not be carried out otherwise than in complete
accordance with the approved details.
Reason – In the interest of highway safety.
21.
A Road Safety Audit shall be carried out for all of
the works within the public highways and the scope of the Audit
shall be agreed in writing with the Local Planning
Authority. The development shall not be
carried out unless in complete accordance with the approved
Audit.
Reason – In the interest of highway safety.
22.
Unless otherwise agreed in writing by the Local
Planning Authority, no part of the development shall be occupied
until a Travel Plan, to help reduce dependency on the use of the
private car has been submitted to and approved in writing by the
Local Planning Authority. The Travel Plan should include clear and
unambiguous objectives and modal split targets, together with a
time-bound programme of implementation, monitoring and regular
review and improvement; Thereafter, the development shall not be
carried out otherwise than in accordance with the terms of the
approved Travel Plan.
Reason - To encourage the reduction of journeys
made to and from the development by private motor vehicles by the
promotion of more sustainable forms of transport.
23.
Prior to the commencement of the development hereby
approved, details of pedestrian links within the site to connect to
existing surrounding infrastructure, to improve the permeability of
the site, shall be submitted to, and approved in writing by, the
Local Planning Authority.
Reason – To ensure a satisfactory form of
development.
24. No development shall take place until the applicant has secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation that has been approved in writing by the Local Planning Authority. The scheme shall provide for:
i) Measures to ensure the preservation in situ, or the preservation by record, of archaeological features of identified importance;
ii) Methodologies for the recording and recovery of archaeological remains including artefacts and ecofacts;
iii) Post-fieldwork methodologies for assessment and analyses;
iv) Report content and arrangements for dissemination, and publication proposals;
v) Archive preparation and deposition with recognised repositories;
vi) A timetable of works in relation to the proposed development, including sufficient notification and allowance of time to ensure that the site work is undertaken and completed in accordance with the strategy;
vii) Monitoring arrangements, including the notification in writing to the County Durham Principal Archaeologist of the commencement of archaeological works and the opportunity to monitor such works;
viii) A list of all staff involved in the implementation of the strategy, including sub-contractors and specialists, their responsibilities and qualifications.
The archaeological mitigation strategy shall be carried out in accordance with the approved details and timings.
Reason – To comply with para 197 and 199 of the NPPF because the site is of archaeological interest.
25.
Prior to the development being beneficially
occupied, a copy of any analysis, reporting, publication or
archiving required as part of the mitigation strategy shall be
deposited at the County Durham Historic Environment Record.
Reason – To comply with para 199 of the NPPF,
which requires the developer to record and advance understanding of
the significance of a heritage asset to be lost, and to make this
information as widely accessible to the public as
possible.
26.
Prior to the commencement of the development hereby
permitted details of the proposed surface water and foul water
drainage scheme shall be submitted to and approved in writing by
the Local Planning Authority, in conjunction with Network
Rail. Such a scheme shall be designed
to ensure that all surface water and foul water drainage from the
development area shall be directed away from Network Rail’s
retained land and structures into suitable drainage
systems. Thereafter the development
shall be carried out in accordance with the details as
approved.
Reason – To ensure the safety, operational needs and
integrity of the railway.
27.
Notwithstanding any details of the proposed boundary
treatment submitted as part of the application, details of trespass
proof fence to be built adjacent to Network Rail’s boundary,
shall be submitted to and approved in writing by the Local Planning
Authority, in conjunction with Network Rail, prior to the
commencement of development. Thereafter
the development shall be carried out in accordance with the details
as approved.
Reason – To ensure the safety, operational needs and
integrity of the railway.
28.
Prior to the commencement of the
development hereby permitted details of a scheme to prevent
vehicular access from the development northwards underneath the
railway structure shall be submitted to, and approved in writing by
the Local Planning Authority, in conjunction with Network
Rail. Thereafter the development shall
be carried out in accordance with the details as approved.
Reason – To ensure the safety, operational needs and
integrity of the railway.
29.
In the event that external lighting is to be used
either during the construction or operational phases of the
development, details shall be submitted to and approved in writing
by the Local Planning Authority, in conjunction with Network Rail
prior to the commencement of development. Thereafter the development shall be carried out in
accordance with the details as approved.
Reason – To ensure the safety, operational needs and
integrity of the railway.
30.
In the event that excavations/piling/buildings are
to be located within 10 metres of the railway boundary a method
statement shall be submitted to and approved in writing by the
Local Planning Authority, in conjunction with Network Rail, prior
to any works commencing on site.
Thereafter the development shall be carried out in accordance with
the details as approved.
Reason – To ensure the safety, operational needs and
integrity of the railway.
31.
Prior to the commencement of the development hereby
permitted, details of the finished floor levels of the dwellings
and gardens hereby approved in relation to existing ground levels
shall be submitted to and approved in writing by the Local Planning
Authority. Thereafter the
development shall be undertaken in accordance with the details as
approved.
Reason – In the interest of visual and residential
amenity.
32.
The mitigation measures set out in the Ecological
Impact Assessment prepared by Naturally Wild (SHA-17-06 September
2018) shall be implemented in full. In
addition, no development shall take place until precise details of
a landscaping scheme to mitigate for the loss of habitat on the
site and for the provision of bat roosting and bird nesting
opportunities on the site have been submitted to and approved in
writing by the Local Planning Authority. Thereafter the approved scheme shall be
implemented in full prior to first occupation of any of the
dwellings on site and maintained for the lifetime of the
development.
Reason – To comply with Core Strategy Policy CS15
(Protecting and Enhancing Biodiversity and
Geodiversity).
33.
No tree or hedgerow removal or works
to buildings shall take place within the bird breeding season
(March to August inclusive) unless a bird nesting survey has first
been undertaken and submitted to and approved in writing by the
Local Planning Authority.
Reason – In the interest of nesting
birds.
34. Prior to the commencement of the development a detailed survey of trees to be affected by the development (both within the site and adjoining its boundary) shall be carried out. The survey shall include the identification of measures to protect existing retained trees in order to protect them from damage by compaction, severance and material spillage, in accordance with BS5837, and shall be submitted to, and approved in writing by, the Local Planning Authority. No demolition or site clearance shall be commenced until the agreed measures are in place and have been inspected by the Council’s Arboricultural Officer. The approved measures shall remain in place through the carrying out of this planning permission. Notwithstanding the above approved specification, none of the following activities shall take place within the segregated protection zones in the area of the trees:
(a) The raising or lowering of levels in relation to existing ground levels;
(b) Cutting of roots, digging of trenches or removal of soil;
(c) Erection of temporary buildings, roads or carrying out of any engineering operations;
(d) Lighting of fires;
(e) Driving of vehicles or storage of materials and equipment;
Reason – To ensure a maximum level of protection in order to safeguard the well-being of the trees on the site and in the interest of the visual amenities of the area.
35.
The retail floorspace shall comprise three self-contained
units of 500 square metres gross each, and thereafter no
amalgamation to larger units shall take place without the prior
written approval of the Local Planning Authority, to whom a
planning application must be made.
Reason – To ensure that the proposed retail units meet
local needs.
36.
The retail units hereby approved
shall only be used for A1 (Shops), A2 (Financial and professional
services) or A3 (Restaurants and Cafes) of the Town and Country
Planning (Use Classes) Order 1987 (as amended) and for no other use
without the prior written approval of the Local Planning Authority,
to whom a planning application must be made.
Reason – To ensure that the proposed retail units meet
local needs and to allow the Local Planning Authority to retain
control over the uses within the site in the interests of
residential amenity.
37.
The use of the retail units hereby permitted shall
not commence until details of the arrangements for the storing of
waste or refuse have been submitted to and approved in writing by
the Local Planning Authority.
Thereafter the development shall be carried out in accordance with
the details as approved.
Reason – In the interest of residential
amenity.
38.
No development in connection with the retail units
hereby approved shall take place until a Servicing Management Plan,
which shall limit the size of
service vehicles visiting the site and make and providing for the
management of the car parking in connection with service vehicles
has been submitted to and approved in writing by the Local Planning
Authority. Thereafter all vehicle
servicing shall take place in accordance with the approved
Servicing Management Plan.
Reason – In the interest of highway
safety.
39.
No external plant, equipment or machinery shall be
installed as part of the proposed retail units without the prior
written approval of the Local Planning
Authority. Where
external plant, equipment or machinery is proposed details shall be
submitted in writing to the Local Planning Authority prior to its
installation and must include the type of plant, equipment or
machinery to be installed and the proposed locations, and if deemed
necessary by the Local Planning Authority, appropriate noise
mitigation measures shall be implemented prior to the plant,
equipment or machinery first becoming operational and thereafter
shall be retained and maintained for the life of the
development.
Reason – In the interest of residential
amenity.
40.
Deliveries to and the collection of waste from the
retail units hereby permitted shall only permitted whilst the
premises is open and in any event
only between the hours of 07.00 and 19.00 Monday to
Saturday and 10.00 and 18.00 on Sundays and Bank Holidays.
Reason – In the interest of residential
amenity.
41.
No development shall take place on the western
section of the application site (to the west of Middleton Back
Road) until the existing industrial/haulage uses have fully ceased
operation.
Reason – In the interests of residential amenity and
highway safety.
42. Prior to the commencement of any development on the western section of the application site (to the west Middleton Back Road) details of the footpath entrance from Chapel Street, including details of the timing of the works to implement the link, shall be submitted to, and approved, by the Local Planning Authority. Thereafter, the development shall be implemented fully in accordance with the approved details.
Reason - To achieve satisfactory pedestrian access provision in the interest of connectivity.
(c) That, should the Section 106 Agreement be not completed within six months but, in the Planning Officer’s opinion, progress is being made towards completion, it be delegated to the Planning Officer to extend the six month time limit.
(d) That, should the Section 106 Agreement be not completed within six months (or a further period extended by the Planning Officer under delegated power) and, in the opinion of the Officer, insufficient progress towards completion has been made, then the application be refused on the grounds that the application has failed to provide adequate mitigation measures to provide a satisfactory form of development in accordance with the requirements of Core Strategy Policy CS4 (Developer Contributions).
18/00905/FUL - 1 Sussex Way, Darlington. Change of use of open space to
private garden and erection of a means of enclosure (as amended by
plans received 14.11.18).
(In reaching its decision, the Committee took into consideration the Planning Officer’s report (previously circulated) and the views of the applicant and an objector, both of whom Members heard).
(NOTE - Councillor J Taylor left the table
for the above item and, after speaking against the application,
left the room, whilst the application was being
discussed).
RESOLVED - That planning permission be granted on receipt of amended plans showing the fence reduced in height from two metres to one metre and subject to the following conditions:
A3 (Standard 3 year time limit)
1. The development hereby permitted shall be carried out in accordance with the approved plans, as detailed below:
· Drg. No. – Page 1 of 5 – Site Plan
· Drg. No. – Page 2 of 5 – Block Plan
· Drg. No. – Page 3 of 5 – Proposed Elevations
· Drg. No. – Page 4 of 5 – Proposed Elevations
· Drg. No. – Page 5 of 5 – Photographs and details of fencing
Reason – To ensure the development is carried out in accordance with the planning permission.
2. E3 (Landscaping scheme to be carried out concurrently with the development).
3.
Notwithstanding the provisions of the Town and
Country Planning (General Permitted Development) (England) Order
2015 (or any order revoking and re-enacting that Order), no
enlargement, improvement or other alteration of the premises,
including any additional structures/building within the curtilage
of the site, and no fencing, walls or other means of enclosure
shall be erected on the site without the prior consent of the Local
Planning Authority, to whom a planning application must be
made.
Reason – In order that the Local Planning
Authority is able to exercise control over future development of
the site, in the interest of visual amenity.
(2) Planning Permission Refused
18/01159/CON - Rear of Grendon Gardens and High Stell, Middleton St George. Discharge of condition 9 (submission of Construction Management Plan) of Outline Planning Permission 15/00976/OUT – Residential Development for 198 dwellings.
(In reaching its decision, the Committee took into consideration the Planning Officer’s report (previously circulated) and the views of the applicants agent, one objector and the objections of Middleton St George, all of whom Members heard).
RESOLVED – That planning permission be refused as, in the opinion of the Local Planning Authority, the noise, nuisance and disturbance arising to local residents as a result of the use of a single access to serve the approved development during the construction period and the resultants impact on their residential amenity would be unacceptable.
18/01160/CON - Rear of Grendon Gardens and High Stell, Middleton St George. Discharge of condition 3 (submission of Construction Management Plan) of Reserved Matters Permission 17/01151/RM1 – Residential Development for 198 dwellings.
(In reaching its decision, the Committee took into consideration the Planning Officer’s report (previously circulated) and the views of the applicants agent, one objector and the objections of Middleton St George, all of whom Members heard).
RESOLVED – That planning permission be refused as, in the opinion of the Local Planning Authority, the noise, nuisance and disturbance arising to local residents as a result of the use of a single access to serve the approved development during the construction period and the resultants impact on their residential amenity would be unacceptable.
Supporting documents: