Agenda item

Applications for Planning Permission and Other Consents under the Town and Country Planning Act and Associated Legislation

Minutes:

NOTE - APPLICATIONS FOR PLANNING PERMISSION – The following standard conditions are referred to in those Minutes granting permission or consent:-

 

Code No.

Conditions

A3

Implementation Limit (Three Years)

The development hereby permitted shall be commenced not later than the expiration of three years from the date of this permission.

 

Reason - To accord with the provisions of Section 91(1) of the Town and Country Planning Act, 1990.

E11

Prior to the commencement of the development hereby approved (including demolition work), details shall be submitted of a scheme to protect the existing trees shown on the submitted plans to be retained.  The submitted details shall comprise generally the specification laid down within BS 5837 and shall include fencing of at least 2.3m high, consisting of a scaffolding frame braced to resist impacts, supported by a weldmesh wired to the uprights and horizontals to dissuade encroachment.  The agreed scheme of protection shall be in place before the commencement of any work, including demolition operations. The Local Planning Authority shall be given notice of the completion of the protection works prior to the commencement of any work to allow an inspection of the measurements to ensure compliance with the approved scheme of protection.  Notwithstanding the above approved specification, none of the following activities shall take place within the segregated protection zones in the area of the trees:

           

(a) The raising or lowering of levels in relation to the existing ground levels;

(b) Cutting of roots, digging of trenches or removal of soil;

(c) Erection of temporary buildings, roads or carrying out of any engineering operations;

(d) Lighting of fires;

(e) Driving of vehicles or storage of materials and equipment.

           

Reason - To ensure that a maximum level of protection in order to safeguard the well-being of the trees on the site and in the interests of the visual amenities of the area.

 

CL5

Any contamination not considered in the Phase 3 Remediation and Verification Strategy but identified during subsequent construction/remediation works shall be subject to further risk assessment and remediation proposals agreed in writing with the Local Planning Authority and the development completed in accordance with any further agreed amended specification of works.

 

Reason - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection.

 

CL6

A Phase 4 Verification and Completion Report shall be complied and reported by a "suitably competent person(s)", documenting the purpose, objectives, investigation and risk assessment findings, remediation methodologies and validation results obtained to demonstrate the completeness and effectiveness of all approved remediation works conducted.  The Phase 4 Verification and Completion Report and shall be submitted and agreed in writing with the Local Planning Authority within 2-months of completion of the development unless the Local Planning Authority dispenses with the requirement specifically and in writing. 

The development site or agreed phase of development site, shall not be occupied until all of the approved investigation, risk assessment, remediation and verification requirements relevant to the site (or part thereof) have been completed, reported and approved in writing by the Local Planning Authority.

 

Reason - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection.

 

PL

The development hereby permitted shall be carried out in accordance with the approved plan(s) as detailed below,

^IN;

 

Reason - To define the consent.

 

 

 