Agenda item

10 Chatsworth Terrace, Darlington

Minutes:

21/00797/OUT - Outline planning permission for residential development of up to 3 dwellings with all matters reserved.

 

(In reaching its decision, the Committee took into consideration the Planning Officer’s report (previously circulated), nine letters of objection received, and the views of an objector, whom the Committee heard).

 

RESOLVED – That Planning Permission be granted subject to the following conditions:

 

1.           A1 Outline (Reserved matters)

 

2.           A2 Outline (Implementation Time)

 

3.           PL (Accordance with Plan)

 

Site Location Plan

02 Block Plan / site layout plan

 

4.           B4 External materials

 

5.           E3 Landscaping (Implementation)

 

6.           Prior to the commencement of the development, precise details of internal driveway(s) and vehicle parking shall be submitted and approved in writing by the Local Planning Authority. The details shall include the number, location and dimensions of all parking spaces/garages and the development shall not be carried out otherwise than in complete accordance with the approved details.

 

REASON – In the interests of highway safety.

 

7.           Prior to the commencement of the development, precise details of 2 No, in curtilage vehicle parking spaces for No, 10 Chatsworth Terrace, shall be submitted and approved in writing by the Local Planning Authority. The details shall include the number, location and dimensions of all parking spaces/garages and the development shall not be carried out otherwise than in  complete accordance with the approved details. Parking Spaces shall be made available prior to the demolition of existing garages and retained permanently thereafter.

 

REASON -  In the interests of highway safety.

 

8.           Prior to the commencement of the development, a Construction Management Plan shall be submitted and approved in writing by the Local Planning Authority. The Plan shall include a dust action plan, the proposed hours of construction, vehicle and pedestrian routes, road maintenance, and signage. The development shall not be carried out otherwise than in complete accordance with the approved details.

             

REASON – In the interests of highway safety.

 

9.           Construction and demolition work shall not take place outside the hours of 08.00 -18.00 Monday - Friday, 08.00 -14.00 Saturday with no working on a Sunday and Bank/Public Holidays without the prior written permission from the Local Planning Authority.

 

REASON – In the interests of residential amenity.

 

10.        Prior to the commencement of the development precise details of a bin storage facility and location shall be submitted and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details and shall be permanently retained thereafter.

 

REASON – In the interests of highway safety.

 

11.        Prior to the occupation of the development, precise details of secure cycle parking and storage details shall be submitted and approved in writing by the Local Planning Authority. The details shall include the number, location and design of the cycle stands and the development shall not be carried out otherwise than in complete accordance with the approved details.

 

REASON – To provide adequate facilities to encourage the use of sustainable modes of transport.

 

12.        Prior to the commencement of the development and any site investigative works a Phase 1 Preliminary Risk Assessment shall be prepared by a "suitably competent person(s)" and submitted to and agreed in writing with the Local Planning Authority. The Phase 1 Preliminary Risk Assessment shall include a Site Inspection and a Conceptual Site Model (CSM) to identify and illustrate all potential contamination sources, pathways and receptors associated with the site and the surrounding environment.

 

REASON - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled. To ensure that risks from land contamination to the future uses of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecological systems, and to ensure that the development can be carried out without unacceptable risks to receptors, in accordance with the National Planning Policy Framework.

 

13.        Prior to the commencement of the development and any site investigation works or at a time agreed in writing by the Local Planning Authority a Phase 2 Site Investigation Strategy (Sampling and Analysis Plan) shall be designed and documented by a "suitably competent person(s)" in accordance with published technical guidance (e.g. BS10175 and Land Contamination: Risk Management (LCRM)) and be submitted to and agreed in writing with the Local Planning Authority, unless the Local Planning Authority dispenses with the requirement specifically and in writing.  The Phase 2 Site Investigation Strategy (Sampling and Analysis Plan) shall be sufficient to fully and effectively characterise and evaluate the nature and extent of any potential contamination and assess pollutant linkages.  No alterations to the agreed Phase 2 Site Investigation Strategy or associated works shall be carried out without the prior written agreement of the Local Planning Authority.

 

REASON - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled. To ensure that risks from land contamination to the future uses of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecological systems, and to ensure that the development can be carried out without unacceptable risks to receptors, in accordance with the National Planning Policy Framework.

 

14.        Prior to the commencement of each phase of the development or at a time agreed in writing by the Local Planning Authority a Phase 2 Site Investigation works shall be conducted, supervised, and documented by a “suitably competent person(s)” and carried out in accordance with the approved Phase 2 Site Investigation Strategy (Sampling and Analysis Plan). A Phase 2 Site Investigation and Risk Assessment Report prepared by a “suitably competent person(s)”, in accordance with published technical guidance (e.g. BS10175 and Land Contamination: Risk Management (LCRM)) and shall be submitted to and agreed in writing with the Local Planning Authority unless the Local Planning Authority dispenses with the requirement specifically and in writing.

 

REASON - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled. To ensure that risks from land contamination to the future uses of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecological systems, and to ensure that the development can be carried out without unacceptable risks to receptors, in accordance with the National Planning Policy Framework.

 

15.        Prior to the commencement of the development or at a time agreed in writing by the Local Planning Authority a Phase 3 Remediation and Verification Strategy shall be prepared by a "suitably competent person(s)" to address all human health and environmental risks associated with contamination identified in the Phase 2 Site Investigation and Risk Assessment. The Remediation and Verification Strategy which shall include an options appraisal and ensure that the site is suitable for its new use and no unacceptable risks remain, shall be submitted to, and agreed in writing with the Local Planning Authority, unless the Local Planning Authority dispenses with the requirement specifically and in writing.

 

REASON - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled. To ensure that risks from land contamination to the future uses of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecological systems, and to ensure that the development can be carried out without unacceptable risks to receptors, in accordance with the National Planning Policy Framework.

 

16.        Any contamination not considered in the Phase 3 Remediation and Verification Strategy but identified during subsequent construction/remediation works shall be reported in writing within a reasonable timescale to the Local Planning Authority.   The contamination shall be subject to further risk assessment and remediation proposals agreed in writing with the Local Planning Authority and the development completed in accordance with any further agreed amended specification of works.

 

REASON - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled. To ensure that risks from land contamination to the future uses of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecological systems, and to ensure that the development can be carried out without unacceptable risks to receptors, in accordance with the National Planning Policy Framework.

 

17.        The Phase 3 Remediation and Verification works shall be conducted, supervised, and documented by a "suitably competent person(s)" and in accordance with the agreed Phase 3 Remediation and Verification Strategy. No alterations to the agreed Remediation and Verification Strategy or associated works shall be carried out without the prior written agreement of the Local Planning Authority.

 

A Phase 4 Verification and Completion Report shall be compiled and reported by a "suitably competent person(s)", documenting the purpose, objectives, investigation and risk assessment findings, remediation methodologies, validation results and post remediation monitoring carried out to demonstrate the completeness and effectiveness of all agreed remediation works conducted. The Phase 4 Verification and Completion Report and shall be submitted and agreed in writing with the Local Planning Authority within 2-months of completion of the development or at a time agreed unless the Local Planning Authority dispenses with the requirement specifically and in writing.

 

The development site or agreed phase of development site, shall not be occupied until all of the approved investigation, risk assessment, remediation, and verification requirements relevant to the site (or part thereof) have been completed, reported, and approved in writing by the Local Planning Authority.

 

REASON - The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled. To ensure that risks from land contamination to the future uses of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecological systems, and to ensure that the development can be carried out without unacceptable risks to receptors, in accordance with the National Planning Policy Framework

 

18.        Prior to the commencement of the development hereby permitted, details of the finished floor levels of the dwellings and gardens hereby approved in relation to existing ground levels shall be submitted to and approved in writing by the Local Planning Authority.  Thereafter the development shall be undertaken in accordance with the approved details.

 

REASON – In the interests of visual and residential amenity.

 

19.        Prior to the occupation of the development hereby approved, details of boundary treatment shall be submitted to, and approved in writing by, the Local Planning Authority.  Thereafter the agreed boundary treatment shall be in place prior to the occupation of the development.

 

REASON – In the interests of visual and residential amenity. 

 

20.        Prior to the commencement of the development hereby approved, details of measures to secure biodiversity net gains, to include built-in nesting opportunities for birds and invertebrates into the fabric of the new builds, shall be submitted to, and approved in writing by, the Local Planning Authority.  Thereafter, the agreed measures shall be fully implemented in the carrying out of the development and shall remain in place thereafter. 

             

REASON – To comply with Core Strategy Policy CS15 (Protecting and Enhancing Biodiversity and Geodiversity) and to provide biodiversity net gains in accordance with the requirements of the National Planning Policy Framework.