21/00869/FUL
- Erection
of 4 no. three bed residential dwellings together with new access,
car parking, boundary treatment, amenity space and associated works
(amended plans received 11 January 2022 and 3 March
2022).
(In reaching its decision, the
Committee took into consideration the Planning Officer’s
report (previously circulated), the nine letters of objection
originally received, the withdrawal of the objections of two
objectors following the submission of amended plans, and the views
of the Applicant and the Applicant’s Agent, whom the
Committee heard).
RESOLVED
– That Planning Permission be granted subject
to the following conditions:
- A3 –
Implementation Limit (Three Years)
- The development hereby permitted shall be carried out in
accordance with the approved plans, as detailed below:
1.
Drawing Number 001 C Ground and First Floor Block
Plans Inc Images
2.
Drawing Number 002 A Loft Floor and Roof
Plan
3.
Drawing Number 9 – 1 Existing and Proposed
Site Plans, Site Location and Boundaries
4.
Drawing Number 21 -1 Proposed Elevations
5.
Drawing Number 90 -1 Site Section Across Bowman
Street
6.
Drawing Number 100 – 1 3D Imagery
REASON – To
ensure the development is carried out in accordance with the
planning permission
-
Prior to the commencement of the development, a
site-specific Demolition and Construction Management Plan shall be
submitted to and approved in writing by the Local Planning
Authority. The plan[s] shall include the following, unless the
Local Planning Authority dispenses with any requirement[s]
specifically and in writing:
a)
Dust Assessment Report which assesses the dust
emission magnitude, the sensitivity of the area, risk of impacts
and details of the dust control measures to be put in place during
the demolition and construction phases of the development. The Dust
Assessment Report shall take account of the guidance contained
within the Institute of Air Quality Management “Guidance on
the assessment of dust from demolition and construction”
February 2014.
b)
Methods for controlling noise and vibration during
the demolition and construction phase and shall take account of the
guidance contained within BS5228 “Code of Practice for noise
and vibration control on construction and open
sites”.
c)
Construction Traffic Routes, including parking areas
for staff and visitors.
d)
Details of wheel washing.
e)
Road Maintenance.
f)
Warning signage.
The
development shall not be carried out otherwise in complete
accordance with the approved Plan.
REASON - In the interests of
residential amenity and highway safety
- CL2 - Phase 2 Site
Investigation Strategy
- CL3
– Phase 2 Investigation Works
- CL4 - Phase 3
Remediation and Verification Strategy
- CL5 -
Construction/Remediation works
- CL6 - Phase 4
Verification and Completion Report
- Notwithstanding the
details shown on the approved plans, a landscaping scheme shall be
submitted to, and approved in writing by, the Local Planning
Authority prior to any works commencing and, upon approval of such
schemes, it shall be fully implemented concurrently with the
carrying out of the development, or within such extended period as
may be agreed in writing by, the Local Planning Authority, and
thereafter any trees or shrubs removed, dying, severely damaged or
becoming seriously diseased shall be replaced, and the landscaping
scheme maintained for a period of five years to the satisfaction of
the Local Planning Authority.
REASON - To ensure a satisfactory
appearance of the site and in the interests of the visual amenities
of the area.
- Notwithstanding the
details shown on the approved plans, precise details of the car
parking arrangements for the development, including the provision
of disabled parking spaces, shall be submitted to and approved in
writing by the Local Planning Authority. The development shall not
be carried out otherwise than in complete accordance with the
approved details and the car parking spaces shall be fully
implemented and available to use prior to the first occupation of
the development.
REASON - In the interests of providing
adequate parking for people with mobility issues
- Notwithstanding the
details shown on the approved plans, precise details of the
visibility splays at the vehicle access point onto the service lane
shall be submitted to and approved in writing by the Local Planning
Authority. The details shall also include the means of enclosure
and sliding gate on the boundary with the service lane and across
the access point. The development shall not be carried out
otherwise than in complete accordance with the approved
plans.
REASON - In the interests of highway
safety.
- Notwithstanding the
details shown on the approved plans, the approved development shall
incorporate four bird boxes into the site layout or design of the
dwellings. The details of the bird boxes shall be submitted to and
approved in writing, by the Local Planning Authority prior to the
commencement of the development and they shall be remain in place
during the lifetime of the development.
REASON - In the interests of the
enhancing the ecological nature of the development and application
site.
- Prior to the
commencement of the development, precise details of secure,
covered, cycle parking provision for use by the occupants and
visitors shall be submitted to and approved in writing by the Local
Planning Authority. The development shall not be carried out
otherwise than in complete accordance with the approved details
which shall be fully implemented and available for use prior to the
first occupation of the development. The agreed details shall
remain in place for the lifetime of the development.
REASON - In the interest of
encouraging the use of sustainable modes of transport.
- The development hereby
approved shall not be carried out otherwise than in complete
accordance with the materials palette contained within Page 9 of
the document entitled “Design and Access Statement. Land to
the rear of Harrowgate Hill Methodist Church. Darlington”
Version 2 dated December 2021 and produced by Phoenix Design
Man.
REASON - In the interests of the
visual appearance of the development and the street
scene.
-
No construction or demolition activities, including
the use of plant and machinery, as well as deliveries to and from
the site, shall take place outside the hours of 08.00-18.00 Monday
to Friday, 08.00-14.00 Saturday with no activities on Sunday or
Bank/Public Holidays without the prior written permission of the
Local Planning Authority.
REASON - In the interests of
residential amenity.
- The EV charging points
shown on the approved plans shall be a minimum of a single phase 13
amp socket.
REASON - To ensure that the proposed
development accords with Policy IN4 of the Darlington Borough Local
Plan (2016 – 2036).